JTY Projects & Case Studies
Custom Wire Harness & Cable Assembly Projects
Power cables, signal harnesses and cable assemblies for battery energy storage, data center power, industrial robotics and OEM equipment.
JTY builds from drawings, wiring tables and samples. We review the end connections, routing, inspection requirements and packing details before production.
- 6 project and application entries
- Drawing and BOM review
- Sample and batch builds
- Inspection to agreed requirements

Selected Projects
Power Harnesses, Signal Assemblies & Cabinet Kits
Have a Similar Project?
Share the equipment application, wire gauge or connector series, and estimated batch quantity. A drawing, wiring table or BOM helps us review the build.
Project Work
Custom Harness Build & Engineering Support
Confirm what goes into the assembly, how it fits, and what needs to be checked before release.
- 01
Build to Drawing
Review terminal orientation, branch dimensions and connector mating against drawings, wiring tables or samples.
- 02
Specified Connectors & Alternatives
Confirm nominated part numbers, sourcing requirements and any proposed substitutions with your team.
- 03
Power & Signal Termination
Specify conductor sizes, connectors, terminals, shielding and protection for each circuit.
- 04
Drawing Revisions & Batch Changeover
Record the approved revision and agree which order or lot the change applies to.
- 05
Labels & Kit Packing
Provide the BOM, label text and packing groups to specify a kit by machine, cabinet or rack.
How We Work
How a Harness Project Runs
- Step 01
Drawing & BOM Check
Confirm the revision, conductors, ends, operating conditions and quote scope.
- Step 02
First-Article Sample
Build to the agreed inputs so your team can check fit and connections.
- Step 03
Production Setup
Agree the sample, fixtures, build instructions and inspection criteria before batch production.
- Step 04
Cutting, Crimping & Assembly
Process wire and terminals according to the assembly and its approved drawing.
- Step 05
Electrical & Label Checks
Check the agreed circuits, labels and inspection items. Specify any required dielectric withstand test and limits.
- Step 06
Kitting & Batch Delivery
Pack by the agreed groups and confirm which inspection records accompany the shipment.
Our Facility
Manufacturing & Inspection
See the JTY workshop and the equipment used for assembly and inspection.





Quality & Documentation
- ISO 9001
- Drawing and BOM revision
- Specified wire documents
- Agreed inspection records
- RoHS / REACH declarations where applicable
Request a Factory Visit
Tell us which production steps, equipment or project documents you would like to review.
Project Directory
Review the Build Scope
Compare the parts and requirements described in the six entries.
Containerized BESS Power & Communication Harness Kits
Define power, communication and monitoring connections. Match each assembly ID to the drawing and pack the cables by container.
02 · High-Voltage Battery800 V EV Battery Pack Harness
Define the connector interface, cell-voltage and temperature circuits, routing and sample checks for the installed pack.
03 · Data Center PowerBranched Cable Assemblies for Rack Power
Define shared and branch ends, length dimensions, branch exit positions and connector orientation on the drawing.
04 · Industrial RoboticsWire Harnesses for Robot Assemblies
Identify moving sections, travel path, connector locations and routing limits before selecting the cable and protection.
05 · Commercial TerminalsInternal Wiring Kit for a Payment Terminal
Match each lead to its board connector and kit revision. Use the packing checklist to check quantities before the terminal reaches assembly.
06 · EV & NPIRapid Prototype Harness Build for an EV OEM
Check critical connector availability while preparing the build and inspection plan. Confirm the first sample before making the rest of the lot.
Send your build scope for a quotation.
Discuss Your ProjectProject FAQ
Project & Quoting Questions
What affects the cost of a custom wire harness or cable assembly?
Cable size and construction, connector part numbers, number of branches and terminations, tests, packing and quantity all affect the quotation.
What files or information do you need for a quotation?
Send a drawing and BOM if available. A wiring sketch, expected quantities, dimensions and both end connections help us review early designs.
How long do samples and batch production take?
The schedule depends on material availability, drawing approval and the requested inspections. JTY confirms timing for the build when quoting.
Can you use specified connectors or propose equivalents?
Send your part numbers and identify which are mandatory. Confirm fit, pinout and required ratings before approving any alternative.
How are wire harnesses checked before shipment?
Agree the checks, limits and records for the assembly. These can include continuity, pinout, dimensions, labels or dielectric withstand where required.
Can harnesses be packed as kits by cabinet or machine?
Provide the parts list for each kit, label text and the grouping needed for packing. Include any separate bag or carton markings.
How do you handle drawing revisions after a sample?
Send the new revision with changes marked and identify the affected lots. Confirm the effective batch and any additional sample or inspection requirements.
Can I order samples before batch production?
Include your sample quantity and estimated batch quantity with the drawing. JTY reviews the parts, tooling and inspection needed for each stage.
Send Your Drawing for a Quote
Attach a drawing, BOM, specification sheet or sample photos, and describe the application. JTY replies with questions or a quotation.



