Electric Vehicles · Application Example
Rapid Prototype Harness Build for an EV OEM
When an EV integration date is fixed, a missing connector can hold up the entire sample lot. This example shows how to check critical parts early and confirm the first harness before building the rest.
- Drawing and BOM revision
- Critical connector availability
- First-article fit and wiring
- Prototype lot release
Agree What the Prototype Must Prove
Confirm whether the sample is for physical fit, electrical integration or formal validation. That purpose determines which materials and checks the prototype requires.
- 01
Work from One Drawing Revision
Reconcile the drawing, BOM and pin map. Resolve mismatches in part numbers, terminal positions and branch dimensions before issuing build instructions.
- 02
Identify Parts That Must Match the Vehicle
Check the specified housings, terminals, seals and mating samples. Confirm stock, arrival dates and tooling for the required wire and terminal combinations.
- 03
Set the Sample Quantity and Review Date
Confirm how many assemblies are needed for fit and integration and when each set is required. Allow time to review the first article before releasing the remaining units.
What Can Run in Parallel
While critical parts are being confirmed, review the released dimensions, prepare the assembly sequence and define how the first article will be checked.
| Workstream | Prepare early | Confirm before proceeding |
|---|---|---|
| Critical parts | Check availability of the housings, terminals, seals and cable on the BOM. | Part numbers for the build and approval for any substitutions. |
| Build preparation | Map cut lengths, branch exits and connector orientation. Plan fixtures and labels. | Released drawing revision, dimensions and tooling for the selected parts. |
| Inspection setup | Prepare fit and pin-to-pin check sheets. Confirm access to any necessary mating parts. | Agreed checks, acceptance limits and records for the first article. |
Release the First Article
Build one complete harness to verify the interfaces, routing and wiring. Record any corrections against the drawing revision before producing the rest of the lot.
- Fit and dimensions
- Confirm connector mating, exit direction, branch reach and clip positions against the drawing and intended installation.
- Terminations and wiring
- Verify terminal seating, circuit continuity and isolation where specified. Define the acceptance limits separately for any requested crimp or electrical tests.
- Prototype lot
- Use the accepted sample and revision to build the remaining units. Mark each set with its revision and include any approved deviations on the release record.