Back to Case Studies

Data Center Power · Application Example

Branched Cable Assemblies for Rack Power

A rack harness can have the right overall length and still miss an equipment port. This example shows how to specify where each branch leaves the main run, what it connects to and how far it must reach.

JTY harness sample with a common white connector and four separate twisted-wire connector branches
  • Main and branch interfaces
  • Breakout positions
  • Free branch lengths
  • Pin-to-pin connections

Start with the Rack Layout

For an equipment bay with several connection points, map the installed route before setting branch lengths and end finishes.

JTY sample with a black main connector, separately covered branches and different terminations
  1. 01

    Fix the Main Connection

    Identify the mating connector, cable exit direction and point from which the drawing measures the main run.

  2. 02

    Locate Each Branch Exit

    Place each breakout along the rack route. Dimension the free length from that breakout to the corresponding connector datum.

  3. 03

    Allow Room to Install and Service

    Check the route around rails and brackets. Confirm cable access at each port and any slack needed to disconnect or remove the equipment.

Define the Branches on the Drawing

Two harnesses can share the same overall length. Moving the breakout changes how much of that length remains available to reach each port.

J0B1B2Breakout SMain runFree branch B1Free branch B2Connector datumCovering end J0B1B2Breakout SMain runFree branchB1Free branchB2ConnectordatumCoveringend
Drawing IDExample destinationWhat to specify
J0 · MainRack supply interfaceMating connector, pinout and datum for the main run.
B1 · BranchController inputBreakout reference, free length and branch-end pinout.
B2 · BranchFan tray inputSeparate free length, branch-end orientation and covering end if required.

Check the Sample Against the Drawing

Fit the prototype in the rack to check branch reach, connector access and slack. Use the same drawing revision and agreed limits for the inspection record.

Branch position and reach
Measure the breakout and each free length from the drawing datum. Record the measurement path and whether the branch is straight or held in a fixture.
Terminations and identification
Verify the branch ID, connector orientation and end finish. If a crimp section is requested, specify the wire and terminal combination to sample.
Electrical connections
Use the connection schedule to identify continuity points. If resistance is specified, record the endpoints, measurement conditions and limit.
JTY terminal cross-section inspection equipment and a magnified crimp image on its monitor
JTY operator at a precision resistance measurement station

Send Your Drawing for a Quote

Attach a drawing, BOM, specification sheet or sample photos, and describe the application. JTY replies with questions or a quotation.

    No file selected

    PDF, XLSX, CSV, JPG or PNG · up to 5 MB. Need an NDA? Mention it above.

    Samples in 3–7 days. Batch production about 30 days after order confirmation.

    * Required fields